Knife Lake

Knife Lake copper project

Scroll down

Knife Lake is a copper exploration project in northeastern Saskatchewan, about 136 kilometres north-northwest of Flin Flon. It hosts the Knife Lake Deposit, a near-surface copper deposit that also contains cobalt, gold, silver and zinc.

Northmark holds an option to earn a 100% interest in the project from Trident Resources Corp. (TSXV: ROCK), formerly Rockridge Resources Ltd. Northmark is the operator during the option period.

s.01Knife Lake

Project facts

Interest:
Option to earn 100% from Trident Resources Corp. Option agreement dated July 13, 2026; option transaction closed September 16, 2026.
Location:
Northeastern Saskatchewan, about 136 km north-northwest of Flin Flon.
Land:
54 mineral claims, about 35,255 hectares. 59 claims, about 37,220 hectares once the Eagle Plains purchase closes (subject to TSX Venture Exchange acceptance and customary closing conditions).
Deposit:
Near-surface, stratabound VMS-style copper-cobalt-gold-silver-zinc deposit.
Drilling:
More than 400 holes, 1968 to 2022.
Resource:
2019 historical estimate, not current. See below.
Royalties:
2.5% net smelter returns (NSR) royalty to Summit Royalties Ltd.; 1.5% NSR royalty to a private individual on certain claims. The Eagle Plains claims will carry a 2.5% NSR royalty to Eagle Plains once that purchase closes.
Technical
report:
NI 43-101 technical report by Dahrouge Geological Consulting Ltd.,
effective July 13, 2026.

~136 km

↠ North-northwest of Flin Flon

3rd of 68

↠ Jurisdictions worldwide for mining investment attractiveness, Fraser Institute 2025 Annual Survey of Mining Companies

s.02Northeastern Saskatchewan

The project is in northeastern Saskatchewan, about 136 kilometres north-northwest of Flin Flon. In the Fraser Institute's 2025 Annual Survey of Mining Companies, Saskatchewan ranked third of 68 jurisdictions worldwide for mining investment attractiveness.

~15m

Average thickness

30-45°

Dip to the east

~4.5km

Traced along strike

~300m

Average known down-dip extent

The Knife Lake Deposit is a near-surface, stratabound deposit of the volcanogenic massive sulphide (VMS) type. It averages about 15 metres thick and dips 30 to 45 degrees to the east.

Drilling has traced it for about 4.5 kilometres along strike, across three zones: Central-South, Bay and North. Its average known down-dip extent is about 300 metres.

Central-South zoneBay zoneNorth zone
s.032026 TECHNICAL REPORT

The Knife Lake Deposit

s.04Not current

Historical resource estimate (2019)

A mineral resource estimate for Knife Lake was prepared in 2019 for Rockridge Resources, before Northmark’s involvement. Under NI 43-101, this is a historical estimate. A Qualified Person has not done enough work to classify it as a current mineral resource, Northmark is not treating it as one, and it should not be relied upon.

Historical mineral resource estimate, effective June 12, 2019. 0.4% CuEq cut-off, pit-constrained. Not current.

Indicated

Tonnes (thousands)
3,836
CuEq (%)
1.02
Cu (%)
0.83

Inferred

Tonnes (thousands)
7,902
CuEq (%)
0.67
Cu (%)
0.53

In this disclosure, "the Company" means Northmark Metals Corp.

The Knife Lake Project hosts a historical NI 43-101 mineral resource estimate with an effective date of June 12, 2019, prepared for Trident's predecessor company, Rockridge, by Moose Mountain Technical Services Inc. under the direction of Sue Bird, P.Eng., an independent qualified person. The estimate is documented in the technical report titled "NI 43-101 Mineral Resource Estimation for the Knife Lake Property, Saskatchewan" (Kenwood, Bird & Meintjes), dated September 27, 2019, and filed on SEDAR+ (www.sedarplus.ca) under Rockridge's issuer profile. At a 0.4% CuEq cut-off, the estimate comprises an Indicated resource of 3.836 million tonnes grading 1.02% CuEq (0.83% Cu, 3.7 g/t Ag, 0.097 g/t Au, 82.0 ppm Co and 1,740.7 ppm Zn) and an Inferred resource of 7.902 million tonnes grading 0.67% CuEq (0.53% Cu, 2.4 g/t Ag, 0.084 g/t Au, 53.1 ppm Co and 1,454.9 ppm Zn), corresponding to approximately 86 Mlbs and 117 Mlbs of contained copper equivalent, respectively. Copper equivalent grades were calculated using 2019 metal price and recovery assumptions and a net smelter return cut-off of approximately C$30 per tonne; these assumptions do not reflect current metal prices, contained-metal figures are reported on a 100% basis, and mineral resources are not mineral reserves and do not have demonstrated economic viability.

The 2019 mineral resource estimate (MRE) was based on metal price assumptions of US$2.80/lb copper, US$1.20/lb zinc, US$18.00/lb cobalt, US$1,300/oz gold and US$17.00/oz silver, with an exchange rate of US$0.77 = C$1.00. Copper equivalent (CuEq) is calculated as CuEq = Cu% + (Zn% × 0.398) + (Co% × 5.901) + (Au g/t × 0.553) + (Ag g/t × 0.005). This is using recoveries of 95% Cu, 90% Zn, 89% Co, 80% Au and 55% Ag.

The Company acquired its interest in the Project after the 2019 estimate was prepared, and accordingly the 2019 estimate is a historical estimate for the purposes of NI 43-101. The Qualified Persons have not done sufficient work to classify the historical estimate as a current mineral resource, and the Company is not treating it as a current mineral resource. To advance the 2019 historical estimate to a current mineral resource estimate, the Qualified Persons have recommended verification of the historical drill hole database, twinning of representative drill holes, confirmation sampling of any accessible core, and updated resource modelling incorporating the 2021 and 2022 infill drilling. Readers are cautioned that the 2019 to 2022 drill core stored on the Property was destroyed in a forest fire and is no longer available for re-sampling. The Company is not aware of any more recent mineral resource estimate for the Property and considers the historical estimate relevant and reliable as an indication of the exploration potential of the Project, although historical information may not be representative of expected results.

s.051968 to 2022

Drilling

More than 400 holes were drilled at Knife Lake between 1968 and 2022. The most recent programs were completed by Rockridge Resources (now Trident Resources): 30 diamond drill holes in 2019, 2021 and 2022, totalling 4,035 metres. The 2019 program was the first drilling at Knife Lake since 2001.

Recent drill programs

ProgramHolesMetresFocus
2019121,053The Knife Lake Deposit: checking historical results and grade continuity
2021122,043The deposit, and regional targets at Gilbert North and Gilbert South
20226939Infill and expansion at the deposit, follow-up at Gilbert South and the first hole at Gilbert West

Selected results, 2021 and 2022 programs

HoleYearFrom–to (m)Core length (m)Cu (%)Au (g/t)Ag (g/t)Zn (%)Co (%)
KF21021202124.62–38.6414.021.950.117.410.530.02
KF22029202213.00–28.7515.751.910.237.790.300.01
KF22030202213.80–29.7015.901.930.247.500.170.02

Drilled core lengths; true thickness has not been determined.

s.06Beyond the deposit

Regional targets

Beyond the deposit, the property has several regional targets, including the Gilbert Lake area (Gilbert North, Gilbert South and Gilbert West), Redhill Lake, Scimitar Lake and Pistol Lake. A 2021 VTEM airborne electromagnetic survey found numerous conductive anomalies along the same rock units that host the Knife Lake Deposit.

Gilbert Lake area·Drilled 2021–2022

Drilled 2021

Gilbert North

  • -Tested in the 2021 program, alongside the deposit.
Drilled 2021 · 2022

Gilbert South

  • -First modern drilling, in 2021, intersected VMS-style sulphides.
  • -Borehole electromagnetic surveys found more conductors to follow up.
  • -Follow-up drilling in 2022.
First hole 2022

Gilbert West

  • -Intersected metavolcanic rocks with semi-massive pyrrhotite and trace chalcopyrite.

Other regional targets·Early stage

  • Redhill Lake(Regional target)
  • Scimitar Lake(Further work recommended)
  • Pistol Lake(Regional target)

Exploration timeline·Regional targets

  1. 2021VTEM airborne survey finds conductive anomalies along the rock units that host the deposit. First drilling at Gilbert North and Gilbert South.
  2. 2022Follow-up drilling at Gilbert South and the first hole at Gilbert West.
  3. 2026NI 43-101 technical report recommends more prospecting, mapping and drilling at Gilbert Lake, Scimitar Lake and other regional targets.
s.07Work program

Next steps

An independent NI 43-101 technical report on Knife Lake by Dahrouge Geological Consulting Ltd., effective July 13, 2026, recommends a two-phase exploration program.

PHASE 1 · RECOMMENDED

C$785,000

Data verification, geological and geophysical modelling, and target generation

PHASE 2 · CONTINGENT ON PHASE 1

C$1.6M

Drill testing of the targets defined in Phase 1. Contingent on Phase 1 results

Only the Phase 1 amount is recommended as committed spending.

At the deposit, the recommended work includes reinterpreting the historical ground geophysics, more geological modelling down dip and along strike, borehole electromagnetic surveys of completed holes, expansion and confirmation drilling, and an updated resource model that includes the 2021 and 2022 infill drilling. Across the property, it includes a high-resolution, deep-penetrating airborne electromagnetic survey with ground follow-up, and more prospecting, mapping and drilling at Gilbert Lake, Scimitar Lake and other regional targets.

Forward-looking statements
s.08Trident Resources Corp.

Option terms

Under an option agreement dated July 13, 2026 with Trident Resources Corp. (TSXV: ROCK), Northmark can earn a 100% interest in Knife Lake by making the cash payments, share issuances and exploration expenditures set out below. The option transaction closed on September 16, 2026.

DateCashSharesExploration spending
On the closing dateC$100,0007,400,000 shares-
On or before the first anniversary of closingC$150,000Shares with a deemed value of C$350,000 (1)C$500,000
On or before the second anniversary of closingC$150,000Shares with a deemed value of C$350,000 (1)C$500,000
TotalC$400,0007,400,000 shares plus shares with a deemed value of C$700,000 (1)C$1,000,000

(1) Shares are issued at the greater of C$0.09 and the 10-day volume weighted average closing price of Northmark's shares on the TSX Venture Exchange at the time. All shares issued under the agreement are subject to a hold period of four months and one day from issuance under Canadian securities laws.

Northmark can exercise the option early by completing the payments and spending, and can pay any part of the exploration spending in cash. Once the option is exercised, Northmark will hold a 100% interest, subject to the existing royalties: a 2.5% NSR royalty to Summit Royalties Ltd., and a 1.5% NSR royalty to a private individual on certain claims.

Forward-looking statements
s.09Pending purchase

Eagle Plains claims

Under an agreement dated October 19, 2026, Northmark has agreed to buy five mineral claims covering about 1,965 hectares from Eagle Plains Resources Ltd. (TSXV: EPL), for C$20,000 in cash and 1,000,000 common shares. Two of the claims adjoin the northern boundary of the property, and three lie within it. On closing, Eagle Plains will hold a 2.5% NSR royalty on the claims, of which 1.0% can be bought back for C$2,000,000.

54claims

About 35,255 hectares today

+5claims

About 1,965 hectares from Eagle Plains

59claims

About 37,220 hectares once the purchase closes

s.10Technical reports

Documents

An independent NI 43-101 technical report on Knife Lake by Dahrouge Geological Consulting Ltd., effective July 13, 2026, recommends a two-phase exploration program.

  • Technical report · 2026

    NI 43-101 Technical Report on the Knife Lake Copper VMS Project, Saskatchewan.

    Dahrouge Geological Consulting Ltd., effective July 13, 2026.

    View on SEDAR+
  • Historical estimate · 2019

    NI 43-101 Mineral Resource Estimation for the Knife Lake Property, Saskatchewan.

    Kenwood, Bird & Meintjes, dated September 27, 2019. Filed on SEDAR+ under the issuer profile of Rockridge (now Trident Resources).

    View on SEDAR+